The Avenues Mall
Client: Mabanee
Capabilities: BMS and Leak Detection Systems
Integrated Automation “iA” was contacted to take part of the build and construction of a new control center in the Avenues Mall.
Our engagement was primarily small but very essential, in fact it made the backbone of the entire center. We installed the building management system for the control center as well as the leak detection system in the main server room.
The integrated system we provided combined the FM200, AHU, FCU, Leak detection and security into one.
Jaber Al-Ahmad Sports Center
Owner: Public Authority for Sports
Consultant: Dartaher Consultant
The YOUTH SPORTS CENTER contains a stadium for 1000 people, an Olympic sized covered swimming pool, a football & basketball playground, an auditorium, tennis & volleyball courts, lecture halls, activities halls, restaurants and cafeterias. This center has a built-up area of 22,000 m2 and it is located in Jaber Al Ahmad City.
Integrated Automation (iA) Co. was engaged to implement and execute our state-of-the-art Solutions/Services which included the complete of Supply, Installation, Testing and Commissioning of Audio Visual System, Intelligent Communication System, Sound Re-enforcement System, Broadcast System, Scoreboards System, Swimming Pools Timing System, Security Systems, Infrastructure Network, IPTV System, IP Public Address System and Building Management System (BMS).
Sabah Al-Ahmad
Owner: Public Authority for Welfare Housing (PAWH), Kuwait
Consultant: KEO consultant (Designer), PACE consultant (Supervision)
Sabah Al-Ahmad City which is 60km south of Kuwait has already been master planned with 75% of the land being allocated primarily for residential areas supported by light industrial and other uses. The remaining 25% is allocated as the ‘central services zone’. In late 2016, PAHW appointed KEO, and its Allied Practice InSite, for the ‘Re-Master Plan of the central services zone and design guidelines for investment residential areas’. Integrated Automation(iA) Co. was engaged to implement and execute our state-of-the-art Solutions/Services which included the complete the Supply, Installation, Testing and Commissioning of, IP Based Tele-Communication System, SMATV System and IP Intercom System.
MOE Schools
Owner: MOE
Capability: Building Management System & Lighting Control
Integrated Automation was engaged to supply, install, test and commission of Integrated Building management System and Lighting Control System for Seven (7) schools across the state ok Kuwait.
The unique implementation included the integration of the BMS, lighting Control and energy management into one open system. Our engineers developed a customized software to incorporate all three aspects into one. The software provided real time monitoring, alarming and event capture of daily activities.
MEW Secondary Substations
Owner: Ministry of Electricity and Water
Capabilities: RTU, SCADA, Wireless Communication
Integrated Automation “iA” was engaged to program, test commission the RTU and SCADA for 244 unmanned secondary substations around Kuwait. The system looked after the Capacitor banks/ Power factor correction units in the stations.
Our system incorporated the programming of the RTU whereby real time monitoring, reporting and alarming were automatically sent to MEW head office via 3G/4G wireless network from Ooredoo.
The project involved manufacturing of the remote panels, offline programming, SCADA built and finally installation and commissioning.
Jahra Shopping Center
Owner: Private Centre
Capability: Sound System, Security System, and Data & Telephone
Integrated Automation “iA” designed and implemented the ELV systems in this project. The client was adamant to cut costs and save on material, therefore “iA” introduced new manufacturers whereby the budget met the client’s target. The manufacturers soon became partners with “iA” which guaranteed continuity and most importantly client support.
Khalijaih Tower
Capabilities: CCTV, Public Address, TV System
Integrated Automation “iA” designed and implemented the ELV systems in Khalijiah tower in Kuwait City.
The project was a fast track project due to the urgency to re-open to public under the full compliance to the ministry of interior – Kuwait.
Our team reacted promptly and delivered.